Caterpillar, Waukesha, and Solar Turbines packaged units
Engine/turbine control system loop checks and setpoints
Gas detection system verification in classified areas
Compressor controls and capacity control checkout
First-start witness and troubleshooting
Fiscal Measurement Commissioning
Flow computer configuration and meter factor verification
Pressure and temperature transmitter calibration
Gas chromatograph commissioning and communication check
Totalizer and report verification
Custody transfer documentation and handover
Completions Package & Documentation
Completions package assembled in client's document control system
Hexagon Smart Completions, Meridian, Aconex, or client format
Loop cards, test records, and punch lists in Bluebeam Revu
As-built redlines updated throughout commissioning
Final turnover package ready for client acceptance
Why Rogue for Commissioning
We Build the Loop Cards as We Go
Redlines and loop card documentation happen in the field — not reconstructed from memory at turnover. What you get at mechanical completion is already in Bluebeam, ready for client review.
Your System, Not Ours
We work in your completions platform from day one — Hexagon Smart Completions, Meridian, Aconex, or your own format. No translation, no reformatting at the end of the job.
We Know the Equipment
Compressor packages, ESD systems, DCS/PLC logic, meter runs — equipment your technicians have reviewed, installed, and commissioned before. No on-the-job learning on your dime.
One Crew, Pre-Comm Through Start-up
The same team that runs pre-commissioning handles loop checks and is on site during first fire. No handoff, no gap in system knowledge, no re-learning the punch list.
Ready to Commission It Right?
Tell us your scope. We'll respond within one business day. MSA available on request.